A Massachusetts Title 5 inspection report — often searched as “Title V” — states whether an on-site sewage disposal system, in its current condition, protects public health and the environment. Only a MassDEP-approved System Inspector’s report on the official form counts for compliance under 310 CMR 15.301 and 310 CMR 15.340. The buyer must receive a copy. Read Pass, Conditionally Passes, Needs Further Evaluation, and Fails against repair cost and timing before you rely on a binding Offer to Purchase. Fyts helps MA buyers put that reading in front of the bid.

This page is about reading the form. For when an inspection is required at transfer, who arranges it, and statewide buyer questions, see Title 5 septic before an offer. For Lexington Health filings and local upgrade / sewer-connection questions, see Lexington MA Title 5 septic.

Title 5 vs. “Title V”

Title 5 is the official name of the State Environmental Code chapter in 310 CMR 15.000. Search queries and some town portals also say Title V (Roman numeral five). Same ruleset. Confirm sewer vs septic on the parcel first (Title 5 septic before an offer).

The Official Inspection Form

MassDEP publishes the current Title 5 Official Inspection Form on the Title 5 septic system forms list (titled Subsurface Sewage Disposal System Form — Not for Voluntary Assessments). MassDEP and local boards will not accept other formats as a valid compliance inspection (Buying or Selling Property with a Septic System).

The form’s completeness checklist groups the packet as:

  • A. Inspector Information — name, company, license number
  • B. Certification — inspector signature/date and one of four outcomes
  • C. Inspection Summary — Pass / Conditional Pass / Further Evaluation / Failure criteria / large-system questions / checklist
  • D. System Information — flow conditions, pumping records, system type, building sewer, tank, D-box, pump chamber, soil absorption system (SAS), cesspool/privy, sketch, site exam / high groundwater
  • E. Report Completeness Checklist

The certification block states the inspector is a DEP-approved system inspector in full compliance with Section 15.340 of Title 5, personally inspected the system, and determined one of:

  1. Passes
  2. Conditionally Passes
  3. Needs Further Evaluation by the Local Approving Authority
  4. Fails

The inspector must submit a copy to the Approving Authority (Board of Health or DEP) within 30 days. The original goes to the system owner; copies go to the buyer (if applicable) and the approving authority. The form itself warns that it describes conditions at the time of inspection only and does not address future performance under the same or different use.

Voluntary assessments that are not done to satisfy 310 CMR 15.301 do not use this Official Inspection Form and do not satisfy transfer-inspection requirements (MassDEP inspection guidance).

Pass, Conditional Pass, Needs Further Evaluation, Fail

MassDEP’s inspection guidance and the Official Inspection Form align on four buyer-facing buckets:

Passes. The inspector has not found information indicating that failure criteria in 310 CMR 15.303 (or 15.304 for large systems) exist. Still read pumping history, bedroom / design-flow assumptions, and any “not determined” notes.

Conditionally Passes. One or more listed components need repair or replacement; after that work and Board of Health approval, the system will pass. On the current form, conditional-pass examples include a metal septic tank more than 20 years of age (or a tank that is structurally unsound / leaking), non-working pump-chamber pumps/alarms, backup or high static water from broken/obstructed pipes or an uneven D-box, and related pipe repairs. Soil absorption systems and cesspools are not fixed under a conditional pass — that path is for the form’s listed component repairs (MassDEP buying/selling guide).

Needs Further Evaluation by the Local Approving Authority. Conditions exist that the Board of Health (or MassDEP, for certain systems) must evaluate — for example certain cesspool/privy setbacks to surface water or wetlands, or septic tank / SAS setbacks to drinking-water supplies where the inspector cannot alone pass or fail the system. Do not treat “further evaluation” as a quiet pass.

Fails. One or more failure criteria in Section C.4 (and C.5 for large systems) are triggered under 310 CMR 15.303 / 15.304. The owner should contact the Board of Health about upgrade requirements. A failed system generally must be upgraded within two years unless the Board or MassDEP authorizes another schedule (MassDEP buying/selling guide).

Fields buyers should not skim

When you open the PDF or paper packet, walk these lines before you negotiate:

  1. Form title — the current MassDEP Official Inspection Form, not a voluntary assessment worksheet; compare the packet to the forms list download if the revision looks unfamiliar.
  2. Inspector certification — MassDEP-approved under 15.340; signed and dated; exactly one of the four outcome boxes selected.
  3. Inspection date vs your closing — see the two- and three-year windows below.
  4. Section C failure-criteria Yes/No grid — backup, surface breakout, high D-box liquid from overloaded SAS/cesspool, high-groundwater intrusion, cesspool setbacks, pumping more than four times in the last year not due to clogged pipes, and related items on the form.
  5. Tank / D-box / pump chamber — material, sludge/scum, tees/baffles, level distribution, alarms.
  6. Soil absorption system — type, whether located, comments on ponding / hydraulic failure; excavation is typically not required once located.
  7. Pumping records (Section D.3) — source of information; pumped as part of inspection?; volume.
  8. Design vs actual bedrooms / design flow — based on 310 CMR 15.203 assumptions shown on the form.
  9. Sketch and high-groundwater method (D.14–D.15) — blank sketches or “could not locate” SAS notes are open risk.
  10. Filing — Board of Health (or MassDEP for state/federal / large / shared systems as required) within 30 days; you still need your copy.

Two-year window and three-year pumping extension (310 CMR 15.301)

Under 310 CMR 15.301(1), for most title transfers a system shall be inspected at or within two years prior to transfer. An inspection conducted up to three years before transfer may be used if the inspection report is accompanied by system pumping records demonstrating that the system has been pumped at least once a year during that time. Weather can push inspection up to six months after transfer with written seller notice of 15.300–15.305 duties. A complete copy of the inspection report goes to the buyer.

That two- / three-year rule is about whether an existing report still counts for the transfer — not a guarantee the system will keep working. Ask for pumping receipts that match the report’s claims.

Who may inspect (310 CMR 15.340)

310 CMR 15.340 requires System Inspectors who perform 15.301 inspections to be approved by MassDEP. No persons other than those listed in 15.340(1) may perform inspections required by 15.301. The Official Inspection Form’s certification block tracks that approval. MassDEP’s Buying or Selling Property with a Septic System guide states that the New England Interstate Water Pollution Control Commission (NEIWPCC) maintains the lists of approved system inspectors — see NEIWPCC’s listings of approved system inspectors and soil evaluators. A home inspection is not a Title 5 inspection.

Using the report in OTP / P&S talks

Put written asks in the offer file: full Official Inspection Form, pumping receipts for any three-year claim, Board of Health filing proof, and who pays for repairs on Conditional Pass or upgrade on Fail. Because a Massachusetts OTP can bind you early, price septic risk before you sign — see Is an offer to purchase binding in Massachusetts? and Massachusetts Offer to Purchase form. Ask your attorney how pass / conditional / further-evaluation / fail language should appear in contingencies or escrow.

Where this shows up locally

FAQ

Is Title V different from Title 5?

No. Title 5 is the code name in 310 CMR 15.000; “Title V” is a common search spelling and appears on some local portals. The compliance form is still the MassDEP Title 5 Official Inspection Form.

What does a conditional pass mean?

Listed components need repair or replacement; after Board of Health-approved work, the system will pass. It is not a free pass on a failed soil absorption system or cesspool (MassDEP buying/selling guide; Official Inspection Form Section C.2).

How long is an inspection valid?

For most transfers, within two years before transfer under 310 CMR 15.301(1). Up to three years if the report includes pumping records showing at least once-a-year pumping during that period. Confirm receipts, not just a seller verbal.

Why do people search “title v septic boston ma”?

“Title V” is a common spelling of Title 5 in search. Confirm sewer vs septic on the parcel first, then read the Official Inspection Form if septic applies (Title 5 septic before an offer).

What if the report is missing pages or uses a prior form revision?

MassDEP and boards will not treat non-approved formats as valid compliance inspections. Ask for a complete Official Inspection Form from a MassDEP-approved inspector. If the packet looks incomplete or does not match the current MassDEP form on the Title 5 septic system forms list, ask your attorney and the Board of Health whether a new inspection is needed for your closing date.

How Fyts fits

Title 5 forms are public templates; your filled report, pumping receipts, and Board of Health file usually are not on the listing card. Fyts is building a Massachusetts catch list so MA buyers can read Pass / Conditional Pass / Further Evaluation / Fail before they lock price. Nearby: Title 5 septic before an offer · Lexington MA Title 5 · Questions before an offer · Offer to Purchase form.